Putting the barrier and the cladding under one trade
On modern commercial facades across New York City, the outer metal panel is rarely the only line of weather defense. Behind an open-joint or dry-joint rainscreen system, the air and water-resistive barrier over exterior sheathing stops bulk water and air leakage, and that membrane is penetrated hundreds of times by sub-framing clips, Z-girts, and hat channels. When one trade applies the barrier and a separate trade drills into it weeks later to hang metal wall panels, split responsibility invites leaks and schedule delays.
Before sub-framing and continuous insulation go up, our crew details rough openings with compatible transition strips, seals clip bases and fastener penetrations as specified on the project drawings, and checks membrane continuity at floor lines, inside corners, and soffit returns.
NYC Metal Panels eliminates trade handoffs by installing fluid-applied or sheet air and water barriers, transition flashings, and panel cladding with our own crew. General contractors, construction managers, and building owners in Manhattan, Brooklyn, Queens, the Bronx, and Staten Island also hire us for standalone facade waterproofing, joint recaulking, and wall coating packages.
Sealant joints at wet-seal panels and facade transitions
Even on tight shop-fabricated facades, long-term weather performance depends on joint preparation and sealant geometry:
- Wet-seal metal panel reveals: Route-and-return ACM panels and solid plate panels in barrier configurations typically use roughly 1/2-inch joints backed by closed-cell or soft-rod backer rod to maintain an hourglass sealant profile without three-sided adhesion.
- Dissimilar material perimeters: Expansion and perimeter joints where metal cladding meets aluminum storefront, curtain wall mullions, brick masonry, EIFS, or stucco require compatible primers and non-staining low-modulus silicone so movement does not tear the bond line.
- Cut-out and recaulking on existing buildings: On weathered commercial elevations, we slice out hardened or split sealant, clean joint substrates back to bare metal or sound masonry, mask factory PVDF panel faces to keep finishes clean, and tool fresh sealant joints.
Water that enters a parapet top, louver perimeter, or window head quickly tracks behind insulation and wall framing. Our exterior waterproofing scope covers sheet-metal head and sill flashings, drip edges, receiver reglets, transition membranes at rough openings, and sealed lap joints under metal parapet copings.
On porous masonry, cement stucco, and aged EIFS elevations, we also clean substrates and apply breathable architectural or elastomeric wall coatings that bridge hairline crazing while allowing trapped interior vapor to escape. We limit our work strictly to vertical walls, parapets, soffits, and facade transitions—not flat roofing or roof membrane replacement.
Waterproofing crew experience and NYC site access
Our field team brings about 19 years of experience in coatings, masonry, EIFS, and stucco alongside our commercial wall panel operations. Every crew works directly for The Dom Construction Group LLC, backed by general liability, umbrella, and workers' compensation insurance (certificates furnished on request) and registration on the New York State public work contractor registry.
Serving the five boroughs from our Albany office, we work from boom or scissor lifts where street frontage allows, or set our own company-owned supported pipe scaffold on tight lots and rear courtyards. Send elevation drawings or close-up joint photos through our bid request page, or call (929) 209-3122 for a free estimate.